Overheating Risk Assessments

With a changing climate, the way we design buildings is changing. XCO2 offers the tools to adapt effectively.

We assess overheating risk for planning and for building control (Part O), guide the design team through available mitigation solutions and resolve the conflicts it creates with noise, air quality and daylight.

The Rockery at The Hyde, Hendon, 470 homes across three high rise buildings on two podiums
Winner
CIBSE Building Performance Consultancy of the Year2022, 2023, 2024, 2025, 2026

Part O, TM59 and the London Plan are three different questions

Overheating is now tested at more than one moment and against more than one standard. In planning, London policy has asked schemes to demonstrate that they follow the cooling hierarchy and manage summer risk for years. Since 2022, Part O of the Building Regulations has applied the question again to new residential buildings in England, this time as a compliance gate at building control. Commercial and non-domestic spaces are assessed separately, usually against CIBSE TM52. A scheme can clear one and fail another.

Part O offers two routes for compliance. The simplified method sets prescriptive limits on glazing areas and on the free area available to remove excess heat, and it is unforgiving on anything with generous glazing or restricted openings. The dynamic thermal modelling route assesses the building as designed, to the CIBSE TM59 methodology, and often provides more opportunities for compliance than the simplified method. That decision on the Part O method can have significant implications for a scheme’s design decisions and costs.

The harder problem is that overheating does not sit on its own. The measures that fix it, more openable area and more ventilation, are the same measures that noise assessment and air quality assessment want restricted, and more glass improves daylight while making overheating worse. Four assessments, one facade. XCO2 assesses all of these design parameters together to arrive at the most effective and compliant scheme.

What we do

Scope is set around the building type, the stage and which of the three triggers applies. Most commissions combine several of the following.

Overheating assessment for planning
Part O compliance, both routes
CIBSE TM59 dynamic thermal modelling
CIBSE TM52 for commercial spaces
Cooling hierarchy demonstration
Glazing, shading and thermal mass appraisal
Natural, hybrid and mechanical ventilation strategy
Construction stage compliance support
Thermal comfort in schools and workplaces
Forest School, Snaresbrook, where a hybrid ventilation strategy met thermal comfort and overheating criteria in classrooms
Southern Grove Lodge, Tower Hamlets, a Victorian workhouse refurbishment with a new six storey apartment block

At Forest School a hybrid ventilation strategy and solar control glazing to the south facing classrooms delivered compliance with the ventilation, thermal comfort and overheating criteria for schools, while the school stayed open through construction. At Southern Grove Lodge, 78 homes in the Tower Hamlets Cemetery Conservation Area, historical replica windows set the overheating and thermal comfort challenge for the whole scheme. Images David Grandorge, and Architecture PLB.

How we work
01

Early screening

A first read on the massing and the glazing, identifying which orientations, room types and single aspect units are at risk before the facade is committed.

02

Route and criteria

Which tests apply and which compliance route suits the scheme: the simplified method where it is achievable, dynamic modelling where the design deserves to be assessed as it actually is.

03

Dynamic thermal modelling

The building modelled room by room on location specific weather data, run against the applicable methodology, with occupancy, gains and ventilation set to the standard.

04

Mitigation and delivery

Failures answered in order of cost: orientation and glazing first, then shading and thermal mass, then ventilation strategy, then cooling. Carried through to construction where the compliance case has to survive value engineering.

Where we work
01Residential and estate regeneration
02Build to Rent and co-living
03Education
04Workplace and light industrial
05Mixed use
06Heritage and conservation areas
Selected projects

Designed to stay comfortable in summer

All projects →
Works with
Common questions
What is an overheating assessment?
An analysis of how warm a building will get in summer and for how long, judged against criteria for the space and its occupants. It is modelled rather than estimated, using location specific weather data and standardised assumptions about occupancy, internal gains and how windows are used, so that the result is comparable and defensible rather than optimistic.
What is Part O?
Part O of the Building Regulations applies to new residential buildings in England and was introduced in 2022. It requires that a building limits unwanted solar gain in summer and provides an adequate means of removing excess heat, and it is demonstrated at building control rather than at planning. It is a separate hurdle from any overheating requirement a planning authority has already imposed, and clearing one does not clear the other.
What is the difference between the simplified method and dynamic modelling?
Part O can be satisfied two ways. The simplified method is prescriptive: it sets limits on glazing area and on the free area available for removing heat, and a design either sits inside them or it does not. The dynamic thermal modelling route assesses the building as designed, following the CIBSE TM59 methodology, and it frequently passes schemes that the simplified method rejects, because it can account for shading, thermal mass, cross ventilation and the actual geometry. Modelling costs more and buys design freedom.
What is CIBSE TM59?
The design methodology for assessing overheating risk in homes. It sets the modelling assumptions, the occupancy profiles and the criteria a residential scheme is judged against, and it is the basis of the dynamic route through Part O as well as the method most London planning authorities expect to see. TM52 is its equivalent for non-domestic buildings.
Does planning require this as well as building control?
In London, generally yes. Policy expects schemes to demonstrate that they have followed the cooling hierarchy, reducing gains and using passive measures before reaching for mechanical cooling, and to show the residual risk is managed. That is a planning submission with its own timetable, made before the Part O case is ever presented to building control.
What happens if a scheme fails?
It depends entirely on when you find out. Early, the answers are cheap: orientation, glazing ratio, shading depth, thermal mass, dual aspect layouts. Late, the options narrow to bigger openings, mechanical ventilation or cooling, each with plant space, cost and running cost attached, and on a noisy or polluted site the openings may not be available at all. This is the single strongest argument for screening at concept.
Do you assess non-residential buildings?
Yes, to CIBSE TM52 and the relevant guidance for the building type. At Forest School the design had to meet the ventilation, thermal comfort and overheating criteria set out in the industry guidance for schools, achieved through a hybrid ventilation strategy and solar control glazing to the south facing classrooms.
Where do you work?
We are based in London and work across the UK, with a second office serving projects in Singapore and the wider Asia Pacific region, where the overheating question is a different problem entirely. Contact us to discuss a scheme.