With a changing climate, the way we design buildings is changing. XCO2 offers the tools to adapt effectively.
We assess overheating risk for planning and for building control (Part O), guide the design team through available mitigation solutions and resolve the conflicts it creates with noise, air quality and daylight.
Overheating is now tested at more than one moment and against more than one standard. In planning, London policy has asked schemes to demonstrate that they follow the cooling hierarchy and manage summer risk for years. Since 2022, Part O of the Building Regulations has applied the question again to new residential buildings in England, this time as a compliance gate at building control. Commercial and non-domestic spaces are assessed separately, usually against CIBSE TM52. A scheme can clear one and fail another.
Part O offers two routes for compliance. The simplified method sets prescriptive limits on glazing areas and on the free area available to remove excess heat, and it is unforgiving on anything with generous glazing or restricted openings. The dynamic thermal modelling route assesses the building as designed, to the CIBSE TM59 methodology, and often provides more opportunities for compliance than the simplified method. That decision on the Part O method can have significant implications for a scheme’s design decisions and costs.
The harder problem is that overheating does not sit on its own. The measures that fix it, more openable area and more ventilation, are the same measures that noise assessment and air quality assessment want restricted, and more glass improves daylight while making overheating worse. Four assessments, one facade. XCO2 assesses all of these design parameters together to arrive at the most effective and compliant scheme.
Scope is set around the building type, the stage and which of the three triggers applies. Most commissions combine several of the following.


At Forest School a hybrid ventilation strategy and solar control glazing to the south facing classrooms delivered compliance with the ventilation, thermal comfort and overheating criteria for schools, while the school stayed open through construction. At Southern Grove Lodge, 78 homes in the Tower Hamlets Cemetery Conservation Area, historical replica windows set the overheating and thermal comfort challenge for the whole scheme. Images David Grandorge, and Architecture PLB.
A first read on the massing and the glazing, identifying which orientations, room types and single aspect units are at risk before the facade is committed.
Which tests apply and which compliance route suits the scheme: the simplified method where it is achievable, dynamic modelling where the design deserves to be assessed as it actually is.
The building modelled room by room on location specific weather data, run against the applicable methodology, with occupancy, gains and ventilation set to the standard.
Failures answered in order of cost: orientation and glazing first, then shading and thermal mass, then ventilation strategy, then cooling. Carried through to construction where the compliance case has to survive value engineering.

239 homes on the former Bath University campus, 30% affordable, with XCO2 on the building services from concept stage. Overheating was answered in the fabric: passive design, continuous insulation, horizontal glazing and shading design.

90 one bedroom affordable homes for Pocket Living in a building of three to five storeys, with communal amenity space on the upper floors. XCO2 provided the environmental and building services support, covering overheating alongside air quality and noise.

Over 1,000sqm of community led, light industrial workspace beside the railway at Loughborough Junction. A fabric first approach with high insulation, thermal mass and natural ventilation for cooling in summer.