Tall buildings channel wind from high levels to the pavement level, but design decisions can help mitigate it.
We model the wind conditions a scheme creates at ground level, assess them against pedestrian comfort and safety criteria, and work with the design team on the massing and landscape that fix them. On masterplans the same analysis shapes where the usable space goes.
Wind speed rises with height. A tall building standing in that flow deflects a large part of it downwards across its windward face, and that descending air arrives at the base of the building as a downdraught, usually at the entrance. Air also accelerates around sharp corners, and it channels and speeds up in the gaps between blocks. Almost every uncomfortable urban space is one of those three effects, and all three are produced by massing rather than by weather.
That is why the assessment is most useful during the earliest massing iterations. The most effective measures are changes to form, orientation, setbacks and the treatment of the podium and the corners. Canopies, screens and planting help at the margins and are what a scheme is left with once the shape is fixed, which is a more expensive and less reliable place to start. A late assessment tends to produce mitigation drawn on top of a problem rather than a design that never had it.
The other half of the question is whether the outdoor space a scheme is selling actually works. Roof terraces, courtyards, play space and the seating outside a cafe all have to be comfortable for the activity they are drawn for, and on exposed sites some of them will not be. Establishing that early moves the amenity to where it can succeed.
Scope is set around the site, the height of the scheme and the stage the design has reached. Most commissions combine several of the following.


Iceland Wharf sits on a former industrial site on the edge of the Queen Elizabeth Olympic Park, between the River Lea and the A12, and was approved by the London Legacy Development Corporation in October 2018 on the strength of a range of environmental and impact assessments. Deptford Creekside sits inside a conservation area, where the form and mass of the scheme was constrained by its heritage context. Images Darc Studio and Metropolitan Workshop.
Long term meteorological data for the location, resolved by direction and season, and read against the surrounding built form that the scheme will sit inside.
The scheme and its context built as a computational fluid dynamics model, run across wind directions to establish conditions at pedestrian level and across the amenity spaces.
Results assessed against established pedestrian comfort criteria, which grade conditions by the activity a space is intended for, alongside a separate check for conditions that would be unsafe.
Where a space fails its intended use, options tested and reported: massing and setback changes first, then landscape, canopies and screening, with the reasoning written for a planning officer.

A masterplan of 2,500 new homes with commercial, community, leisure and retail space, new pedestrian and cycle routes and London’s largest new park in 70 years. XCO2 worked on the wind and microclimate, daylight and sunlight, and energy and sustainability.

The largest regeneration project of its kind in London, with 1,746 homes across Phases 3 to 5 on an exposed riverside site. XCO2 was part of the winning competition team and delivered the wind and microclimate work within the environmental impact assessment.

A ten storey scheme of 67 homes above a Families and Homes Hub and a retail unit, where XCO2 produced the Wind Microclimate Assessment alongside the whole life carbon and circular economy work.