Services/Wind and Microclimate

Wind Microclimate Assessments

Tall buildings channel wind from high levels to the pavement level, but design decisions can help mitigate it.

We model the wind conditions a scheme creates at ground level, assess them against pedestrian comfort and safety criteria, and work with the design team on the massing and landscape that fix them. On masterplans the same analysis shapes where the usable space goes.

The Peel Project, Brent, 200 homes with healthcare and retail within the wider South Kilburn masterplan
Winner
CIBSE Building Performance Consultancy of the Year2022, 2023, 2024, 2025, 2026

Helping shape building design to improve pedestrian conditions

Wind speed rises with height. A tall building standing in that flow deflects a large part of it downwards across its windward face, and that descending air arrives at the base of the building as a downdraught, usually at the entrance. Air also accelerates around sharp corners, and it channels and speeds up in the gaps between blocks. Almost every uncomfortable urban space is one of those three effects, and all three are produced by massing rather than by weather.

That is why the assessment is most useful during the earliest massing iterations. The most effective measures are changes to form, orientation, setbacks and the treatment of the podium and the corners. Canopies, screens and planting help at the margins and are what a scheme is left with once the shape is fixed, which is a more expensive and less reliable place to start. A late assessment tends to produce mitigation drawn on top of a problem rather than a design that never had it.

The other half of the question is whether the outdoor space a scheme is selling actually works. Roof terraces, courtyards, play space and the seating outside a cafe all have to be comfortable for the activity they are drawn for, and on exposed sites some of them will not be. Establishing that early moves the amenity to where it can succeed.

What we do

Scope is set around the site, the height of the scheme and the stage the design has reached. Most commissions combine several of the following.

Wind microclimate assessment for planning
Pedestrian comfort and safety assessment
Computational fluid dynamics modelling
Early massing and orientation testing
Entrance and podium downdraught studies
Amenity space and roof terrace usability
Effect on surrounding streets and neighbours
Masterplan scale microclimate studies
Mitigation design and option appraisal
Wind chapters within an EIA
Natural ventilation and external air movement
Iceland Wharf, a mixed use scheme on a former industrial site between the River Lea and the A12
Deptford Creekside, a commercial led mixed use scheme within the Creekside Conservation Area

Iceland Wharf sits on a former industrial site on the edge of the Queen Elizabeth Olympic Park, between the River Lea and the A12, and was approved by the London Legacy Development Corporation in October 2018 on the strength of a range of environmental and impact assessments. Deptford Creekside sits inside a conservation area, where the form and mass of the scheme was constrained by its heritage context. Images Darc Studio and Metropolitan Workshop.

How we work
01

Site wind climate

Long term meteorological data for the location, resolved by direction and season, and read against the surrounding built form that the scheme will sit inside.

02

Computational modelling

The scheme and its context built as a computational fluid dynamics model, run across wind directions to establish conditions at pedestrian level and across the amenity spaces.

03

Comfort and safety

Results assessed against established pedestrian comfort criteria, which grade conditions by the activity a space is intended for, alongside a separate check for conditions that would be unsafe.

04

Mitigation and reporting

Where a space fails its intended use, options tested and reported: massing and setback changes first, then landscape, canopies and screening, with the reasoning written for a planning officer.

Where we work
01Residential and estate regeneration
02Tall buildings
03Mixed use
04Masterplanning
05Workplace
06Public realm and landscape
Selected projects

Exposed sites, consented schemes

All projects →
Works with
Common questions
What is a wind microclimate assessment?
A study of the wind conditions a proposed development creates at ground level and across its outdoor spaces, and of the effect it has on the streets and spaces around it. Conditions are modelled across wind directions and then graded against criteria for pedestrian comfort and safety, so that each space can be judged against the activity it is designed for.
Does my planning application need one?
Usually where a scheme is tall relative to what surrounds it, where it creates new public realm, or where it sits on an exposed site. Requirements vary between authorities and are set out in local validation lists and in policy for tall buildings, and on major schemes wind forms a chapter of the environmental statement rather than a standalone report.
What criteria are the results judged against?
Pedestrian comfort is assessed using established criteria that set an acceptable wind speed for each type of activity, from sitting through to walking briskly, based on how often that speed is exceeded across a year. A separate and stricter safety threshold identifies conditions that would be hazardous rather than merely unpleasant. A space passes or fails against the use it is intended for, so a thoroughfare and a terrace are held to different standards.
What causes wind problems around buildings?
Three effects account for most of them. Downdraught, where a tall facade deflects fast moving air from height down to street level, typically at the entrance. Corner acceleration, where flow speeds up around a sharp vertical edge. And channelling, where air is squeezed and accelerated between adjacent blocks. All three are consequences of form and arrangement rather than of an unusually windy site.
What can be done if the assessment finds a problem?
In order of effectiveness: change the massing, the orientation or the setbacks; adjust the podium and soften the corners; then add canopies, screens and planting. The first group is only available while the design is still moving, which is the argument for running the assessment early. Landscape mitigation works, but it is asked to do more than it should when it arrives after the shape is fixed.
When should the assessment be done?
At massing, and then again to confirm the design that results. An early run tells the team which corners, entrances and spaces are at risk and what the plan would have to do about them. Commissioned after the design is fixed, the assessment can only describe the conditions and propose mitigation on top of them.
Where do you work?
We are based in London and work across the UK, with a second office serving projects in Singapore and the wider Asia Pacific region. Contact us to discuss a scheme.